Overview.
Your Content Goe
The largest public hospital in the eastern region of Libya with 1200 beds. Proudly, FARES has managed to successfully procure, install and run its large network in the year 2014.
All departments were connected to the Data Centre via fibre optic cables, which were connected to two Cisco core switches with 10GB speed and each LAN has 1 GB speed itself, controlled by Dell servers. All are protected by firewalls and intrusion detectors.
s Here
Client.
Benghazi Medical Center
Year.
2014

The project was divided into two main parts:
The project was divided into two main parts:
Installing complete Cisco Solution for wired and wireless network, covering the whole hospital, consisting of:
The Data Centre, consists of the following equipment:
Servers Dell M1000e blade enclosure contains 16 blade servers of type:
- M520 Blades
- M610 Blades
Storage EMC Complete Solution
- Clariiont
- Cellera
- Centera
- Data Domain
- Networker
- Tape library (Dell ML6000)